Planning, estimation, and scheduling are very important in a construction project and it helps toavoid delays in the project. The current project deals with planning, costing, estimation, andscheduling of office buildings. It is a G+5 reinforced concrete framed structure with modern features.The emergency exit and slope have been provided at the opening of the building for hassle-freemovement of disabled people. The building is planned in accordance with the National Building Codeof India 2016. The plan area of the building is 745.22 m2 and the plot area is 3100 m2. FSI is taken as1.5. The plot is situated in Kharghar. Generally, soil strata in Kharghar is found to be hard. The safebearing capacity (SBC) of soil is 300 KN/m2. The office building is provided with proper ventilationas per the code. Ceiling height is taken as 3 m high from the floor. Microsoft Project Professional2013 is used for scheduling. MS project helps in tracking down the project and works effectively. MSproject is flexible enough for other purposes such as road mapping tools or financial management.MS project provides a detailed report on the network diagram, timeline, tracking, cost overruns, cashoverview, cash flow, critical tasks, and late tasks.Keywords: Costing, estimation, MS project, planning, scheduling
Related articles
Other papers on this site that share keywords with this one, closest match first.
International Journal of Construction Engineering and Planning