Procurement and Deployment of Equipment for Contracts in Civil Engineering Construction

  1. Oluwadare Joshua OYEBODE ✉

Abstract

Many contracts have suffered a lot of delays and have faced challenges due to procurement-related matters and inadequate manpower to handle equipment for optimal performance. This study was aimed at the procurement of equipment and utilization of machines in civil engineering contracts. Methodology is basically site visitation, literature review and discussion with engineers, experts and workers on site. Parameters are liable for the procurement of materials and utilizing their lead down to the performance of project managers on any construction project. The project manager must be capable of overseeing time, money, quality, health, and safety, as well as addressing the needs of the owners and stakeholders. The ability to procure types of equipment and find methods to utilize them under civil engineering contracts is a skill one needs to acquire. Findings of this study demonstrate that efficient project management involvement makes sure that project goals are met during both the planning and execution phases. It also shows that choosing the right kind, quantity, and size of construction equipment has an impact on how much time and effort is needed, as well as how productive a project is on the job site. Leveraging future technologies will enable the development of materials, the handling of machinery, and the procurement of equipment. It is recommended that utilization of the machines is carried out to the fullest to test out the equipment’s capabilities and to improve engineering works. It is therefore important for engineers to be familiar with the characteristics of civil engineering contracts and also be proficient in and capable of procuring equipment and utilizing the machines.Keywords: Management, equipment, procurement, utilization, construction project

References (30)

  1. Anaman KA, Osei‐Amponsah C. Analysis of the causality links between the growth of the
  2. construction industry and the growth of the macro‐economy in Ghana. Construct Manage Econ.
  3. ; 25 (9): 951–961.
  4. Goubran S. On the role of construction in achieving the SDGs. J Sustain Res. 2019; 1 (2): e190020.
  5. Kalinzi C, Ntayi J, Muhwezi M, Kabagambe L. Exploring stakeholder’s understanding of
  6. procurement performance expectations gap in public works contracts in Uganda’s district local
  7. governments (DLG): a qualitative analysis of results. In: 20th Annual Thinking Qualitatively
  8. Virtual Conference. University of Alberta and University of British Columbia, 2021, July 5–9.
  9. Silvius G. Sustainability as a new school of thought in project management. J Cleaner Prod. 2017;
  10. Varnäs A, Balfors B, Faith-Ell C. Environmental consideration in the procurement of construction
  11. contracts: current practice, problems and opportunities in green procurement in the Swedish
  12. construction industry. J Cleaner Prod. 2009; 17 (13): 1214–1222.
  13. Khan AR, Deep S, Asim M. Analysis of maintenance records of construction equipment and their
  14. importance in minimizing equipment breakdown during the project execution phase to lessen time
  15. overrun. Int J Civil Eng Technol. 2017; 8 (83): 11–23.
  16. Manikandan M, Adhiyaman M, Pazhani KC. A study and analysis of construction equipment
  17. management used in construction projects for improving productivity. Int Res J Eng Technol. 2018;
  18. (3): 1297–1303.
  19. Oyebode OJ. Analysis of job planning and tendering processes for civil engineering projects in
  20. Nigeria. In: NSE Abuja 2017 Diversification of Nigerian Economy: Engineering Perspective. 2017.
  21. Kalinzi C, Ntayi J, Muhwezi M, Kabagambe L. Performance expectations gap in public works
  22. contracts: a theoretical review. In: Thai KV, Salia PJ, Mwakibinga FA, editors. Advancing Public
  23. Procurement: Theories and Practices. 1st edition. Highland Beach, FL: PrAcademics Press; 2018.
  24. Srivastava A, Jawaid S, Singh R, Gehlot A, Akram SV, Priyadarshi N, Khan B. Imperative role of
  25. technology intervention and implementation for automation in the construction industry. Adv Civil
  26. Eng. 2022; 2022: Article 6716987. doi:10.1155/2022/6716987
  27. Kumari KS, Vikranth J. A study on resource planning in highway construction projects. Int J Eng
  28. Res Appl. 2012; 2 (4): 1960–1967.
  29. Makinde JK, Oke AA. Labour management practices of construction contractors in Kainji/New
  30. Bussa Area of Niger State, North-Central Nigeria. J Environ Sci. 2009; 13 (1): 91–97.

Read more of it

Subscribe to one journal or build your own list of several. One invoice, one payment, access for a full year.

Subscribe to journals →

Publish your article

Peer-reviewed journals across every subject, with open access options. Send your manuscript to the right editor today.

Publish with us → Calculate your APC
Support