International Journal of Construction Engineering and Planning

Risk Management in Construction Projects: Consultants’ Perspective

  1. Fida’ Ahmad
  2. Safa’ Seder
  3. Ibrahim Mahamid ✉

Abstract

Construction projects are among the most vulnerable projects to uncertainty and risks which affect project schedule and increase costs. The issue of risk in construction is a global one, and the Palestinian construction sector is no different. This study aims to identify risk factors in construction projects from consultants’ perspective in Palestine and to prepare risk map for them, then to suggest response for critical ones. A survey using a questionnaire was conducted using 41 risk factors from previous studies to define their frequency and severity levels. A total of 62 respondents who are working in construction projects in Palestine participated. This study identified 31 critical risk factors causing delay from the studied list. Top five critical factors were: shortage of qualified labors and experience, lack of labor productivity or efficiency, lack of equipment and equipment obsolescence, payment delays from owner, and payment delays from contractors. Responses were suggested for the top five critical factors. This study is significant for all parties involved in construction projects in Palestine. It is anticipated that the findings will help in evolution of the Palestinian construction industry by creating risk plans to avoid project failure. Keywords: Construction, consultants, risk factors, delays, risk map

References (41)

  1. Enshassi A, Sherif M, Abu Mosa J. Risk management in building projects in Palestine: contractors’
  2. perspective. Emirates J Eng Res. 2008; 13 (1): 29–44.
  3. Chapman RJ. The controlling influences on effective risk identification and assessment for
  4. construction design management. Int J Project Manage. 2001; 19 (3): 147–160.
  5. Smith NJ, Merna T, Jobling P. Managing Risk in Construction Projects. Malden, MA: John Wiley
  6. Mahendra PA, Pitroda JR, Bhavsar JJ. A study of risk management techniques for construction
  7. projects in developing countries. Int J Innov Technol Explor Eng. 2013; 139–142.
  8. Banaitiene N, Banaitis A. Risk management in construction projects. In: Banaitiene N, editor. Risk
  9. Management – Current Issues and Challenges. London: IntechOpen; 2012. pp. 429–448.
  10. Mahamid I, Al-Ghonamy A, Aichouni M. Risk matrix for delay causes in construction projects in
  11. Saudi Arabia. Res J Appl Sci Eng Technol. 2015; 9 (8): 665–670.
  12. Cox A, Townsend M. Strategic Procurement in Construction: Towards Better Practice in the
  13. Management of Construction Supply Chains. London: Thomas Telford; 1998.
  14. Palestinian Central Board of Statistics. The Performance of the Palestinian Economy During 2021.
  15. Ramallah: Palestinian Central Bureau of Statistics; 2021. Available at
  16. https://pcbs.gov.ps/site/512/default.aspx?lang=en&ItemID=4148
  17. Mahamid I, Bruland A, Dmaidi N. Causes of delay in road construction projects. J Manage Eng.
  18. ; 28 (3): 300–310.
  19. Abd El-Karim MSBA, El Nawawy OA, Abdel-Alim AM. Identification and assessment of risk
  20. factors affecting construction projects. HBRC J. 2017; 13 (2): 202–216.
  21. Al-Najjar JM. Factors Influencing Time and Cost Overruns on Construction Projects in the Gaza
  22. Strip. Master’s Thesis. Palestine: Islamic University; 2008.
  23. Mahamid I, Dmaidi N. Risks leading to cost overrun in building construction from consultants’
  24. perspective. Organ Technol Manage Construct. 2013; 5 (2): 860–873.
  25. Ebrat M, Ghodsi R. Construction project risk assessment by using adaptive-network-based fuzzy
  26. inference system: an empirical study. KSCE J Civil Eng. 2014; 18 (12): 13–27.
  27. Drob C, Zichil V. Overview regarding the main guidelines, standards and methodologies used in
  28. project management. J Eng Stud Res. 2013; 19 (3): 26–31.
  29. Odimabo O. Risk Management System to Guide Building Construction Projects in Developing
  30. Countries: A Case Study of Nigeria. PhD Thesis. Wolverhampton: University of Wolverhampton;
  31. Fernando CK, Hosseini MR, Zavadskas EK, Perera BAKS, Rameezdeen R. Managing the financial
  32. risks affecting construction contractors: implementing hedging in Sri Lanka. Int J Strategic Property
  33. Manage. 2017; 21 (2): 212–224.
  34. PMBOK® 2013 A Guide to the Project Management Body of Knowledge (PMBOK®), 5th edition.
  35. Newton Square, PA: Project Management Institute, Inc.; 2013.
  36. Rezakhani P. Classifying key risk factors in construction projects. Buletinul Institutului Politehnic
  37. din lasi. Sectia Constructii, Arhitectura. 2012; 58 (2): 27.
  38. Chen GX, Shan M, Chan AP, Liu X, Zhao YQ. Investigating the causes of delay in grain bin
  39. construction projects: the case of China. Int J Construct Manage. 2019; 19 (1): 1–14.
  40. Kamal A, Abas M, Khan D, Azfar RW. Risk factors influencing the building projects in Pakistan:
  41. from perspective of contractors, clients and consultants. Int J Construct Manage. 2022; 22 (6):

Read more of it

Subscribe to one journal or build your own list of several. One invoice, one payment, access for a full year.

Subscribe to journals →

Publish your article

Peer-reviewed journals across every subject, with open access options. Send your manuscript to the right editor today.

Publish with us → Calculate your APC
Support