Risk Map For Delay Causes in Construction Projects in Palestine: Contractors' Perspective

  1. Ibrahim Mahamid ✉
  2. Ahmad Abdelaal
  3. Qutaibah Daraghma

Abstract

This study is conducted to identify the main risks in construction projects in Palestine from contractors’ perspective. Questionnaire survey is the tool used to achieve the objectives of the study. 41 critical risk factors in projects associated with project duration were identified and classified as external and internal factors. The risk map for the investigated causes created based on their perceived severity and frequency of occurrence. The findings reveaeled 29 causes in the red zone of the risk map, 11 in the yellow zone and 1 in the green zone. The top severe risk factors are: delayed payments by the owner, closure and siege by the authorities, poor site supervision, segmentation of the Palestinian governorates, late payments to subcontractors, change orders by frequent adjustments of the owner, lack of qualified labors, unrealistic completion date of projects, weather conditions, and rework due to noncompliance with contract documents.

References (69)

  1. Aljassasi, O. & Dawood, M. (2021). Construction Risks Management of Building Projects in
  2. Sultanate of Oman: Contractor and Owner Perspective. Journal of Student Research, 10(3).
  3. https://doi.org/10.47611/jsr.v10i3.1287.
  4. Al-Momani, A. H. (2000). Construction delay: a quantitative analysis. International Journal of
  5. Project Management, 18(1), 51-59.
  6. Amu, O. O. & Adesanya, D. A. (2011). Mathematical expression for explaining project delays in
  7. Southwestern Nigeria. Singapore Journal of Scientific Research, 1(1):59–67 .
  8. Aziz, R. F. (2013). Ranking of delay factors in construction projects after Egyptian revolution.
  9. Alexandria Engineering Journal, 52(3):387–406 .
  10. Banaitis, Audrius & Banaitiene, Nerija. (2012). Risk Management in Construction Projects.
  11. D. G. and P. Mallery, SPSS for Windows step by step: A simple guide and reference, 4th ed.
  12. Boston: Allyn & Bacon., 2003.
  13. Dmaidi N., Mahamid I. & and Shweiki I. (2016). Identifying the Critical Problems of Construction
  14. Contracting Management in Palestine. Jordan Journal of Civil Engineering, Volume 10, No. 1,
  15. Doloi H., Sawhney A., Iyer K. C. & Rentala S. (2012). Analysing factors affecting delays in Indian
  16. construction projects. Int. J. Proj. Manag., vol. 30, no. 4, pp. 479–489, 2012, doi:
  17. 1016/j.ijproman.2011.10.004 .
  18. Enshassi, A. & Abu Mosa, J. (2008). Risk management in building projects: Owners’ perspective.
  19. Islamic Univ., J., 16(1): 95-123.
  20. Fadhili I, Ally (2011). RISK MANAGEMENT IN CONSTRUCTION PROJECT Case study of
  21. building and civil contractors. The Ardhi University, Tanzania.
  22. Gündüz, M., Nielsen, Y., Özdemir, M., (2013). Quantification of Delay Factors by Using Relative
  23. Importance Index (RII) Method for Construction Projects in Turkey. Journal of Management in
  24. Engineering, 29(2):133–139.
  25. Hamzah. N., Khoiry, M.A., Arshad. I., Tawil. N.M. & CheAni. A.I. (2011). Cause of Construction
  26. Delay. Theoretical Procedia Engineering, pp 490 – 495.
  27. Haron C. R., & Arazmi, A. L. (2020). Late Payment Issues of Subcontractors in Malaysian
  28. Construction Industry. Planning Malaysia, 18(11). https://doi.org/10.21837/pm.v18i11.711
  29. Lewis, J.P. (2011). Project Planning, Scheduling, and Control. The McGraw. Hill companies .
  30. Mahamid, I. (2011). Risk matrix for factors affecting time delay in road construction projects:
  31. Owners’ perspective. Eng. Construct. Architectural Manage., 18(6): 609-617.
  32. Marzouk M. M. & El-Rasas T. I. (2014). Analyzing delay causes in Egyptian construction
  33. projects,” J. Adv. Res., vol. 5, no. 1, pp. 49–55, 2014, doi:10.1016/j.jare.2012.11.005.
  34. Nanayakkara, Samudaya & Perera, Srinath & Senaratne, Sepani & Weerasuriya, Thilini &
  35. Bandara, Dilum. (2021). Blockchain and Smart Contracts: A Solution for Payment Issues in
  36. Construction Supply Chains. Informatics. 8. article 36. 10.3390/informatics8020036.
  37. Pai, S. K. & Bharath, J. R. (2013). Analysis of Critical Causes of Delays in Indian Infrastructure
  38. Projects. International Journal of Innovative Research & Development, 2(3):251–263 .
  39. Paz, Juan & Rozenboim, David & Cuadros, Alvaro & Cano, Sandra & Escobar, John. (2018). A
  40. Simulation-Based Scheduling Methodology for Construction Projects Considering the Potential
  41. Impacts of Delay Risks. Construction Economics and Building. 18. 41.
  42. 5130/AJCEB.v18i2.5842.
  43. PCBS: Palestinian Central Bureau of Statistics (2022). Palestinian Labor Force Survey: Annual
  44. Report: 2018, Retrieved from (http://www.pcbs.gov.ps/Downloads/boo;2433.pdf) dated (2022).
  45. Petrovic D., D. P. (2017). Risk Management in Construction Projects - A Knowledge Management
  46. Perspective from Swedish Contractors. Royal Institute of Technology, Stockholm, Sweden.
  47. PMI; Project Management Institute (2008). Guide to the project management body of knowledge
  48. (PMBOK® Guide). 4th ed. Newtown Square: Project Management Institute; 2008.
  49. Karim, Nur & Abdul Rahman, Ismail & Memon, Aftab & Jamil, Nurhidayah & Azis, Ade. (2012).
  50. Significant risk factors in construction projects: Contractor's perception. CHUSER 2012 - 2012
  51. IEEE Colloquium on Humanities, Science and Engineering Research. 347-350.
  52. 1109/CHUSER.2012.6504337.
  53. Kikwasi, G. J. (2012). Causes and Effects of Delays and Disruptions in Construction Projects in
  54. Tanzania. Australasian Journal of Construction Economics and Building, Conference Series,
  55. Salem, Z. T. A., & Suleiman, A. (2020). Risk factors causing time delay in the Jordanian
  56. construction sector. International Journal of Engineering Research and Technology, 13(2), 307-
  57. Sambasivan M. & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction
  58. industry. Int. J. Proj. Manag., vol. 25, no. 5, pp. 517–526, 2007, doi:
  59. 1016/j.ijproman.2006.11.007 .
  60. Suprapto, M., Bakker, H. L., Mooi, H. G., & Moree, W. (2015). Sorting out the essence of owner–
  61. contractor collaboration in capital project delivery. International Journal of Project Management,
  62. Tang W., Qiang M., & Duffield C. (2007). Risk management in the Chinese construction
  63. industry,” Journal of Construction Engineering and management, no. May 2012, pp. 944–956,
  64. Weide R. V. D., Rijkers B., Blankespoor B., and Abrahams A.(2018). Obstacles on the road to
  65. Palestinian economic growth. Retrieved from
  66. (https://thedocs.worldbank.org/en/doc/f4169a6aa1fdb9287f73cd1d43b62bad0050022021/original/Obstacles-on-the-Road-to-Palestinian-Economic-Growth.pdf) dated
  67. Zaini A., Takim R., & Endut I. (2011). Contractors’ strategic approaches to risk assessment
  68. techniques at project planning stage. IEEE Symposium on Business, Engineering and Industrial
  69. Applications (ISBEIA), Langkawi, Malaysia. pp. 320–325, 2011

Read more of it

Subscribe to one journal or build your own list of several. One invoice, one payment, access for a full year.

Subscribe to journals →

Publish your article

Peer-reviewed journals across every subject, with open access options. Send your manuscript to the right editor today.

Publish with us → Calculate your APC
Support