International Journal of Electrical Power System and Technology

A novel approach for placement of Phasor Measurement Unit & counting their optimal number

  1. AJIT KUMAR ✉
  2. Mr. Sandeep Bhongade Mr. Sandeep Bhongade

Abstract

In India Power system monitoring is based mainly on measurements provided by Remote Terminal Unit (RTU). For power system measurement synchronized phasor or Phasor Measurement Unit (PMU) is popular choice in abroad and its popularity is increasing day by day because of its several feature. Synchrophasor technology was first introduced in india in 2011-12[7],[8],[9]. Direct measurement of voltage or current phasor is possible because of PMU which was not possible earlier. Global positioning system (GPS) provides time synchronized data. In this paper a new approach is used for optimal placement of PMU, counting their number & time elapsed. The approach is applied on IEEE-14 bus system bus system .Here all the bus which are taken into consideration is either completely observable or at some depth of un-observability is also taken into account. Index Terms— PMU, Observability, Phasor, IEEE-14 Bus system

References (11)

  1. A. G. Phadke, “Synchronized phasor measurements in power systems”, IEEE Computer Applications in Power , Vol. 6, Issue 2, pp. 10-15, April 1993.
  2. A. G. Phadke, J. S. Thorp, and K. J. Karimi, “ State Estimation with Phasor Measurements”, IEEE Transact ions on Power Systems, Vol. 1, No. 1, pp. 233-241,February 1986.
  3. . T. L. Baldwin, L. Mili, M. B. Boisen, and R Adapa, “Power System Observability With Minimal Phasor Measurement Placement”, IEEE Transactions on Power Systems, Vol. 8, No. 2, pp. 707-715, May 1993
  4. R. F. Nuqui and A. G. Phadke, Phasor measurement unit placement based on incomplete observability," in IEEE 2002 Power Engineering Society Summer Meeting, vol. 2, Jul. 25, 2002, pp. 888{893}.
  5. Bei Xu, Y. J. Yoon and A. Abur, “Optimal Placement and Utilization of Phasor Measurements for State Estimation”, Power System Computation Conference, August 2005, Liege, Belgium.
  6. Bei Xu and A. Abur, “Observability Analysis and Measurement Placement for Systems with PMUs”, Proceedings of the IEEE PES Power Systems Conference and Exposition, October 2004, New York, NY.
  7. Hariram,A., “Synchrophasor initiatives in Indi a,” Power System Operation Corporation Limited (a wholly owned subsidiary of Power Grid Corporation of India Limited), June 2012, available
  8. at www.scribd.com/doc/114896908
  9. Agarwal, V. K., Agrawak, P. K., and Kumar, R., “Experience of commissioning of PMUs pilot project in the northern region of India,” 16th National Power Systems Conference “Innovations
  10. for Smart Grids, Visakhapatnam, India, 15–17 December 2010.
  11. Ghosh,D.,Ghose, T., and Mohanta,D. K., “Commun ication feasibility analysis for smart grid with phasor measurement units,” IEEE Trans. Indust. Inform.,Vol. 9,No. 3, pp. 1486–1496, 2013.

Read more of it

Subscribe to one journal or build your own list of several. One invoice, one payment, access for a full year.

Subscribe to journals →

Publish your article

Peer-reviewed journals across every subject, with open access options. Send your manuscript to the right editor today.

Publish with us → Calculate your APC
Support